Ledger
Dates we will stand behind. Nothing else.
Confirmed primary-source facts. Unconfirmed dates stay off this list rather than guessed. Corrections to our own pages are recorded here with the date they were made.
2009-09-01
Annex 7 operative
EU GMP Annex 7 (manufacture of herbal medicinal products) in force. CONFIRMED against the European Commission text.
2011
Annex 11 operative version
Computerised systems. The 2011 text is the operative one. A proposed revision and a separate AI annex are draft — not binding.
2015-10-01
Annex 15 operative
Qualification and validation. Equipment is qualified in context at a site. It is not certified as an intrinsic property of a skid.
2022
Annex 1 revision
Sterile manufacture revision is the operative Annex 1. Grades A–D and a documented CCS apply to sterile products. Do not copy Grade C onto a non-sterile extract room.
2025-07-09
GACP Rev. 1 adopted
EMA/HMPC/246816/2005 Rev. 1 adopted 9 July 2025.
2025-08-12
GACP Rev. 1 published
Published 12 August 2025. Supersedes the 2006 guideline. Current EU agricultural-stage reference.
2026-04-28
US cannabis — partial Schedule III
FDA-approved marijuana products and state-licensed medical marijuana only. All else remains Schedule I. No blanket “marijuana is Schedule III.” Re-check the primary record before you rely on it.